{"id":541,"date":"2024-08-02T12:15:44","date_gmt":"2024-08-02T10:15:44","guid":{"rendered":"https:\/\/technische-boeden.de\/home\/"},"modified":"2024-08-22T14:27:39","modified_gmt":"2024-08-22T12:27:39","slug":"home","status":"publish","type":"page","link":"https:\/\/technische-boeden.de\/en\/","title":{"rendered":"Home"},"content":{"rendered":"\n<div class=\"wp-block-columns alignwide is-layout-flex wp-container-core-columns-is-layout-9010eb36 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"--col-width:70%;flex-basis:70%\">\n<div class=\"wp-block-group alignwide has-global-padding is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group alignwide is-vertical is-layout-flex wp-container-core-group-is-layout-fe9cc265 wp-block-group-is-layout-flex\">\n<h2 class=\"wp-block-heading\" style=\"font-size:clamp(1.403rem, 1.403rem + ((1vw - 0.2rem) * 1.121), 2.3rem);text-decoration:underline\">The most economical solution for construction projects<\/h2>\n\n\n\n<p>As a geology company with decades of experience in countless small, medium and large construction projects in civil engineering, we do not believe that there is always just one right foundation solution. Rather, this is decided on the basis of economic aspects against the background of the respective individual construction project.<\/p>\n\n\n\n<p>Our \u201cTechnical floors\u201d are to be understood in this context. They offer a further alternative for identifying the most economical foundation solution in each case.<\/p>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide is-vertical is-layout-flex wp-container-core-group-is-layout-fe9cc265 wp-block-group-is-layout-flex\">\n<h2 class=\"wp-block-heading\" style=\"font-size:clamp(1.403rem, 1.403rem + ((1vw - 0.2rem) * 1.121), 2.3rem);text-decoration:underline\">Definition<\/h2>\n\n\n\n<p>Technical soil is excavated soil that is modified by technical processes in such a way that it fulfills its function as an optimal construction material and can be reused within the construction site.<br\/>Additives (e.g. stabilizers, plasticizers) can be added to the soil for the technical modification of the soil for backfilling as an optimal construction material, provided that these are proven to be environmentally safe.<\/p>\n<\/div>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide is-vertical is-layout-flex wp-container-core-group-is-layout-fe9cc265 wp-block-group-is-layout-flex\">\n<h2 class=\"wp-block-heading\" style=\"font-size:clamp(1.403rem, 1.403rem + ((1vw - 0.2rem) * 1.121), 2.3rem);text-decoration:underline\">Fundamentals<\/h2>\n\n\n\n<p>It can be deduced from DIN 18300 that the surveyor must describe what he considers to be the most economical foundation solutions for the earthworks of the respective construction project. In addition to the exact description of the foundation solution, the delivery materials to be used must also be specified.<\/p>\n\n\n\n<p><strong>The \u201cconstruction site\u201d is understood as a system<\/strong> in which it is assumed that all natural and artificially introduced materials interact with each other (e.g. an introduced force always generates a counterforce). When determining the most economical solution, it is therefore not a question of comparing the cheapest products. Sustainable economic efficiency can only be determined by looking at the whole system.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-center is-layout-flow wp-block-column-is-layout-flow\" style=\"--col-width:30%;flex-basis:30%\">\n<figure class=\"wp-block-video\"><video height=\"1920\" style=\"aspect-ratio: 1080 \/ 1920;\" width=\"1080\" controls=\"\" muted=\"\" src=\"http:\/\/technical-soil.com\/wp-content\/uploads\/2024\/08\/TB_Stuetz_Wev.mp4\"><\/video><\/figure>\n<\/div>\n<\/div>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-nk-awb nk-awb alignfull\" style=\"padding-top:var(--wp--preset--spacing--40);padding-right:0;padding-bottom:var(--wp--preset--spacing--40);padding-left:0\"><div class=\"nk-awb-wrap\" data-awb-type=\"image\" data-awb-parallax=\"scroll\" data-awb-parallax-speed=\"0.5\" data-awb-parallax-mobile=\"false\" data-awb-image-background-size=\"cover\" data-awb-image-background-position=\"50% 50%\"><div class=\"nk-awb-overlay\" style=\"background: #0068b3cc;\"><\/div><div class=\"nk-awb-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-scaled.jpg\" class=\"wp-image-130 jarallax-img\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-scaled.jpg 2560w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-300x225.jpg 300w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-1024x768.jpg 1024w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-768x576.jpg 768w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-1536x1152.jpg 1536w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-2048x1536.jpg 2048w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-500x375.jpg 500w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-800x600.jpg 800w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-1280x960.jpg 1280w, https:\/\/technische-boeden.de\/wp-content\/uploads\/2024\/08\/20240612_120058-1920x1440.jpg 1920w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/div><\/div><div class=\"nk-awb-wrap-content has-global-padding is-layout-constrained wp-container-nk-awb-is-layout-44946049 wp-block-nk-awb-is-layout-constrained\">\n<div class=\"wp-block-columns alignwide has-base-2-color has-text-color has-link-color wp-elements-cabf41c4829bf5f85f029502d170ff9a is-layout-flex wp-container-core-columns-is-layout-9010eb36 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-style-tw-shadow has-base-2-color has-text-color has-background has-link-color wp-elements-95d4f81ecac6d09ee3e8d24f8d26b86d is-layout-flow wp-container-core-column-is-layout-057de46b wp-block-column-is-layout-flow\" style=\"--col-width:60%;background-color:#0068b3b3;padding-top:var(--wp--preset--spacing--20);padding-right:var(--wp--preset--spacing--20);padding-bottom:var(--wp--preset--spacing--20);padding-left:var(--wp--preset--spacing--20);flex-basis:60%\">\n<h3 class=\"wp-block-heading has-base-2-color has-text-color has-link-color wp-elements-60668038942b518665d587ceb596620e\" style=\"margin-bottom:0\">Criteria for determining economic viability<\/h3>\n\n\n\n<div style=\"height:1em\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ul style=\"line-height:1.8\" class=\"wp-block-list is-style-default has-medium-font-size tw-block-animation tw-animation-fade-in\">\n<li>Checking the completeness of the subsoil report, plausibility check<\/li>\n\n\n\n<li>Determination of the parameters relevant to the construction project from the subsoil report (soil, groundwater)\n<ul class=\"wp-block-list is-style-tw-arrow\">\n<li>Determination of the risk from the subsoil report<\/li>\n\n\n\n<li>Determination of the parameters required for the final and usage properties for the respective construction project (e.g. load-bearing capacity (dynamic, static loads), immobilization of pollutants, water permeability, thermal and electrical conductivity, vibration-damping properties, etc.) Load-bearing capacity (dynamic, static loads), pollutant immobilization, settlement behavior, water permeability, thermal and electrical conductivity, vibration-damping properties, etc.).<\/li>\n\n\n\n<li>Preliminary planning and pre-dimensioning of the foundation solution<\/li>\n\n\n\n<li>Pre-static calculations, FEM for more complex foundation solutions<\/li>\n\n\n\n<li>Determination and description of the required installation technology<\/li>\n\n\n\n<li>Determination and description of logistical requirements<\/li>\n\n\n\n<li>CO<sub>2<\/sub>-balancing if necessary<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p>The result is the chemical and mechanical parameters of the soil required to fulfill the function of the building material to be used and the type of foundation to be selected.<\/p>\n\n\n\n<p><strong>Technical soils assume that economic viability is always given if the excavated soil extracted on site can be reused as a building material within the construction site after technical adaptation if necessary. In addition to the transportation and disposal costs for the excavated soil, the procurement of building materials is also eliminated, which leads to a considerable conservation of resources.<\/strong><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-vertically-aligned-stretch is-style-tw-shadow has-background is-layout-flow wp-container-core-column-is-layout-057de46b wp-block-column-is-layout-flow\" style=\"--col-width:40%;background-color:#0068b3b3;padding-top:var(--wp--preset--spacing--20);padding-right:var(--wp--preset--spacing--20);padding-bottom:var(--wp--preset--spacing--20);padding-left:var(--wp--preset--spacing--20);flex-basis:40%\">\n<h3 class=\"wp-block-heading has-base-2-color has-text-color has-link-color wp-elements-ed3f94e4c7e2353a332159b916e28ee5\" style=\"margin-bottom:0\">Further planning stages<\/h3>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The static calculations of the pre-dimensioned planning solution result in the essential characteristic values that the technical floor must achieve in order to fulfill the planned function with the necessary safety.<\/p>\n\n\n\n<p>A recipe is created based on the excavated soil, the implementation of which results in a technical soil that should achieve the required characteristics.<\/p>\n\n\n\n<p>If the technical floor does not meet the parameters required by the structural analysis, there are two ways to optimize it:<\/p>\n\n\n\n<ol style=\"line-height:2\" class=\"wp-block-list\">\n<li>The quantity of aggregates is changed so that the technical soil meets the specifications.<\/li>\n\n\n\n<li>The planned dimensioning of the foundation component is adjusted with the characteristic values achieved on the basis of the formulation to such an extent that a \u201csafe\u201d component is achieved.<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<div class=\"wp-block-group has-border-color has-custom-tb-gr-n-border-color has-global-padding is-layout-constrained wp-container-core-group-is-layout-80fb368b wp-block-group-is-layout-constrained tw-block-animation tw-animation-fade-in\" style=\"border-width:4px;padding-top:var(--wp--preset--spacing--30);padding-right:var(--wp--preset--spacing--30);padding-bottom:var(--wp--preset--spacing--30);padding-left:var(--wp--preset--spacing--30)\">\n<h2 class=\"wp-block-heading has-text-align-center\" style=\"font-size:em;text-decoration:underline\">An overall iterative process<\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center has-medium-font-size\" style=\"font-style:normal;font-weight:400;line-height:1.6\">In practice, the optimization of the foundation solution is an iterative process in which the statics and the formula are adjusted alternately. As the foundation solutions are developed individually for each construction site, the quality assurance of the technical floor must also be defined individually for each construction project during the planning stage. The final costs are calculated for this optimized foundation solution.<\/h3>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The most economical solution for construction projects As a geology company with decades of experience in countless small, medium and large construction projects in civil engineering, we do not believe that there is always just one right foundation solution. Rather, this is decided on the basis of economic aspects against the background of the respective [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-541","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/pages\/541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/comments?post=541"}],"version-history":[{"count":3,"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/pages\/541\/revisions"}],"predecessor-version":[{"id":545,"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/pages\/541\/revisions\/545"}],"wp:attachment":[{"href":"https:\/\/technische-boeden.de\/en\/wp-json\/wp\/v2\/media?parent=541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}